Call: 0151 928 9566
  • Thornton Waste to Resource Plant - Fleetwood
    • Client: Barhale Construction plc
    • Package: Labour, Minor Plant and Temporary Materials
    • Project Details: Green Waste, OGM and Biofilter Structures
    • Formwork: 15,463 m2
    • Reinforcement: 1,793 tonne
  • Description Here