Call: 0151 928 9566
  • M56 - Bowden Bridge Manchester
    • Client: Carillion plc
    • Package: Labour, Plant and Temporary Materials
    • Project Details: New bridge with “off site” construction for placement during motorway closure
    • Formwork: 1,232 m2
    • Concrete: 479m3
    • Reinforcement: 178 tonne
  • M56 - Bowden Bridge Manchester
  • Thornton Waste to Resource Plant - Fleetwood
    • Client: Barhale Construction plc
    • Package: Labour, Minor Plant and Temporary Materials
    • Project Details: Green Waste, OGM and Biofilter Structures
    • Formwork: 15,463 m2
    • Reinforcement: 1,793 tonne
  • Thornton Waste to Resource Plant - Fleetwood
  • Carlisle Northern Development Route - Carlisle
    • Client: Birse Civils Ltd
    • Package: Labour, Plant and Temporary Materials
    • Project Details: 1 No 160 meter span River Bridge, I No Concrete Bridge
    • 3 No Underpasses, 160 Meter Long Retaining Wall and 30 No Flood Culverts.
    • Formwork:6,151m2
    • Concrete: 3,277m3
    • Reinforcement: 508 Tonne.
  • Carlisle Northern Development Route - Carlisle
  • Longley Lane Waste Recycle Centre - Manchester
    • Client: Costain Group plc
    • Package: Labour, Plant and Materials
    • Project Details:Tank bases, bund walls, push walls and slabs to multiple buildings
    • to one of the Greater Manchester Waste main reception plants
    • Formwork:12,876 m2
    • Concrete:7,625 m3
    • Reinforcement:644 Tonne.
  • Longley Lane Waste Recycle Centre - Manchester
  • BNRR (M6 Toll Road) - Birmingham
    • Client: CAMBBA(Carillion, Alfred McAlpine, Balfour Beatty, AMEC)
    • Package: Labour and Temporary Materials
    • Project Details: 20nr Bridges, 3nr Underpasses, 6nr Toll Tunnels, Precast Stringcourse
    • Formwork: 50,600 m2
    • Reinforcement; 3622 Tonne
  • BNRR (M6 Toll Road) - Birmingham